The 2025 Bentley Continental is an all-wheel-drive coupé, petrol plug-in hybrid-powered with an automatic gearbox. It has an engine displacement of 4.0 litres and an output of 575 kW (782 hp). The battery is 25.9 kWh and the range is 85 km as stated by the manufacturer. AC charging power is 11 kW and the connector is Type 2.

The asking price is 375,000 €.

bilbil.fi has no price estimate for this car, because there are too few comparable cars. A dealer typically sells this model in about 54 days.

The odometer reads 4,000 km, which works out at about 2,000 km per year. The next inspection is due an estimated 15/01/2029.

Running the car costs an estimated:

Vehicle tax, insurance and electricity come to about 9,170 € per year.

The original tyre size is 275/35 R22.

The seller is Bentley Suomi (Espoo).

The car has been for sale for 33 days since 20/10/2026.

Basic information

Registration number
JNK-222
Mileage
4,000 km
carVertical Verify mileage authenticity
20% off
Fuel
Plug-in hybrid (petrol)
Displacement
3,996 cm³
Model year
2025
First registration
15/01/2025
Gearbox
Dual-clutch automatic
Drivetrain
All-wheel drive
Acceleration (0–100)
3.2 s
Body type
Coupé
Colour
Grey
Tyre size
275/35 R22
Wheel size
22″
Steering wheel
Left-hand
Country of manufacture
United Kingdom
Assembly plant
Bentley, Crewe
bilbil.fi ID
279911

Engine and drivetrain

Engine code
DTV
Engine layout
V engine
Cylinders
8
Valves per cylinder
4
Engine position
Front
Forced induction
Twin turbo
Camshaft drive
Timing chain
Fuel grade
Petrol 98
Second fuel
Electricity
Power
575 kW / 782 hp
Engine speed at peak power
6,000 rpm
Rated power
441 kW
Engine speed at peak torque
2,000 rpm
Number of gears
8
Top speed
335 km/h

Electric drive and charging

Battery capacity
25.9 kWh
Battery chemistry
Lithium-ion
Electric range
85 km
Top speed on electric power
140 km/h
Charging type
Type 2
Charge port position
Left rear
AC charging connector
Type 2
AC charging phases
Three-phase
AC charging power
11 kW
AC charge to full
159 min
Battery warranty
160 000 km
Electric motor, position
Gearbox
Electric motor, power
140 kW
Electric motor, torque
450 Nm

Consumption and emissions

Electricity consumption
28.1 kWh/100 km (combined)
WLTP, combined
19.8 kWh/100 km
Fuel tank
80 l
Emissions test cycle
WLTP
Exhaust aftertreatment
Petrol particulate filter
Pass-by noise
67 dB

Dimensions and weights

Width
1,966 mm
Width including mirrors
2,187 mm
Wheelbase
2,851 mm
Boot space
260 l
Payload
461 kg

Body and chassis

Seats
4
Doors
2
Front suspension
Air suspension
Rear suspension
Air suspension
Front brakes
Disc brakes
Rear brakes
Disc brakes
Tyre pressure monitoring
Direct (sensors in the wheels)

The information on this page is compiled by Bilbil from dozens of public and non-public sources from Finland and elsewhere in Europe. Check the details stated by the seller in the original listing.

85 km Range WLTP
25.9 kWh Battery capacity
156,000 km Warranty remaining 160,000 km from new

Charging time

  • AC charge to full159 min

Charging connectors

Alternating current (AC)
  • Type 2
Slow charging
  • Charge port positionLeft rear
  • AC charging phasesThree-phase

Range

  • WLTP85 km
  • In summerapprox. 72 km
  • In winterapprox. 55 km

Battery specifications

  • Battery chemistryLithium-ion

Generation
Generation 5 (3S)
Produced
2024–
Sub-model
GT (3S)

Gearbox
Automatic

Equipment

No notable equipment was identified from the listing.

Equipment rating

Asking price: 375,000 €

No estimate

No price estimate: there are too few comparable cars.

No price changes during the tracked period.

First inspection due by 15/01/2029

About 2 years left. A car or van is inspected for the first time four years after it was first taken into use.

Check with Traficom

Sale periods

Bentley Suomi, Espoo, Uusimaa 33 days for sale
20/10/202631/10/202611/11/202622/11/2026

Sales

No previous sales.

See detailed history data from carVertical: the report covers the car's mileage records, possible damage, previous owners and registrations.

View history report
BILBIL −20% off the report
Service provided by carVertical

When buying from a dealer, it's worth asking for a finance quote directly from them. Before that, though, get a loan quote from Rahalaitos too: it gives you something to compare the dealer's offer against, and a way to negotiate better terms.

Viewing quotes is free and doesn't commit you to anything. Rahalaitos puts your application out to as many as 25 lenders at once.

€
500 € 70,000 €
10 years
1 year 10 years
Estimated monthly instalment approx. 775 €/mo
See offers
Comparison provided by Rahalaitos

The APR under Finnish consumer protection law is 7.48%, calculated for a loan of €7,500 with a repayment period of 9 years, an account fee of €5, an opening fee of €35 and a nominal interest rate of 5.80%. The amount repayable would then be €10,215, i.e. €94/month. A credit card's APR may be 18.97%, calculated for a loan of €1,500 with a repayment period of one year and a nominal interest rate of 17.50%. The amount repayable would then be €1,646 in total, i.e. €146 per month. The final APR, loan term and monthly instalment are set out in the loan agreement. Lenders draw up the loan agreement based on an individual credit assessment. The nominal interest rate offered may vary between 4.19% and 20%, and annual loan costs between €0 and €150. The loan term offered varies between 1 and 20 years. Loan amounts offered range from €500 to €70,000.

Vehicle tax under the tax tables in force in 2026.

  • Base tax 412 €/yr
  • Driving power tax 97 €/yr
  • Total vehicle tax 509 €/yr

Base tax is based on gross weight. Driving power tax is based on gross weight (approx. 2800 kg).

An estimate of this car’s charging costs and the whole household’s electricity bill. Adjust the annual mileage, charging split and home type to match your own.

Annual mileage 15,000 km
Share charged at home 80 %
  • Home charging· 2,108 kWh 422 €/yr
  • Public charging· 499 kWh 274 €/yr
  • Other consumption· 6,000 kWh 1,200 €/yr
  • Standing charges 120 €/yr
  • Total electricity bill 2,016 €/yr

≈ 168 €/month · of which car charging approx. 696 €/yr

The kWh figure for charging includes conversion losses: more is drawn from the grid than reaches the battery (home charging ~12%, rapid charging ~7%).

  • Electricity consumption 28.1 kWh/100 km
  • Comparison: equivalent petrol car approx. 1,943 €/yr

For a plug-in hybrid, the estimate assumes approx. 55% electric driving; the rest is driven on petrol (approx. 874 €/yr).

Recommendation

Spot price or fixed rate?

Electric cars are usually charged overnight, and charging can be scheduled. If you take advantage of the cheapest hours (for example with scheduled charging), a spot-price contract is typically the cheapest option. If you can't or don't want to track electricity prices and time your charging, a fixed-price contract is safer: the price is predictable and price spikes won't catch you out.

Electricity contracts

  • Nordic Green Energy · Ilmasto pörssisähkö Cheapest

    Margin and monthly fee −50% for 12 months

    • Margin 0.68 c/kWh 55 €/yr
    • Standing charge 5.98 €/month 72 €/yr
    • Supplier's share 127 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 775 €/yr
    • First year −63 € 712 €/yr

    Includes a Tallink Silja gift card

    View offer
  • Vihreä Älyenergia · Verraton

    Margin 0.34 c/kWh and standing charge €2.99/month for 12 months

    • Margin 0.59 c/kWh 48 €/yr
    • Standing charge 4.99 €/month 60 €/yr
    • Supplier's share 108 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 756 €/yr
    • First year −44 € 712 €/yr

    Open-ended contract, two weeks’ notice period

    View offer
  • Hehku Energia · Hehku Pörssi

    Standing charge €0 for 3 months

    • Margin 0.39 c/kWh 32 €/yr
    • Standing charge 4.5 €/month 54 €/yr
    • Supplier's share 86 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 734 €/yr
    • First year −14 € 721 €/yr
    View offer
  • Vihreä Älyenergia · Vire Tuuli

    2 months €0, reduced margin for 12 months

    • Margin 0.99 c/kWh 80 €/yr
    • Standing charge 5.99 €/month 72 €/yr
    • Supplier's share 152 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 801 €/yr
    • First year −80 € 721 €/yr

    100% wind power

    View offer
  • Vattenfall · Optimi Pörssisähkö

    Standing charge €0 for 6 months

    • Margin 0.5 c/kWh 41 €/yr
    • Standing charge 5.95 €/month 71 €/yr
    • Supplier's share 112 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 761 €/yr
    • First year −36 € 725 €/yr

    Fossil-free

    View offer
  • Cheap Energy · Pörssisähkö

    Margin and standing charge reduced for 6 months

    • Margin 0.78 c/kWh 63 €/yr
    • Standing charge 4.9 €/month 59 €/yr
    • Supplier's share 122 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 771 €/yr
    • First year −45 € 725 €/yr
    View offer
  • Fortum · Fortum Tarkka

    Standing charge €0 for 3 months

    • Margin 0.59 c/kWh 48 €/yr
    • Standing charge 5.99 €/month 72 €/yr
    • Supplier's share 120 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 768 €/yr
    • First year −18 € 750 €/yr
    View offer
  • Vihreä Älyenergia · Hintalukko
    • Margin 0.59 c/kWh 48 €/yr
    • Standing charge 4.99 €/month 60 €/yr
    • Supplier's share 108 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost 756 €/yr

    You can lock in the margin

    View offer
  • Fortum · Fortum Latauspaketti

    2 c/kWh cashback on home charging

    • Margin 0.59 c/kWh 48 €/yr
    • Standing charge 9.99 €/month 120 €/yr
    • Supplier's share 168 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Home charging cashback 2 c/kWh −42 €/yr
    • Total cost 774 €/yr

    20% off rapid charging (Charge & Drive) or €0.10/kWh at Tesla chargers

    View offer
  • Aalto Energia · Luotsi Pörssisähkö

    Margin 0.34 c/kWh + standing charge €0 for 4 months

    • Margin 1.99 c/kWh 161 €/yr
    • Standing charge 5.95 €/month 71 €/yr
    • Supplier's share 233 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 881 €/yr
    • First year −68 € 813 €/yr

    After 4 months 0.54 c/kWh until 31 Dec 2026, then 1.99 c/kWh

    View offer
  • Nordic Green Energy · Uusiutuva pörssisähkö

    Monthly fee −50% for 6 months

    • Margin 0.99 c/kWh 80 €/yr
    • Standing charge 9.99 €/month 120 €/yr
    • Supplier's share 200 €/yr
    • Electricity price (spot average ~8 c/kWh) 649 €/yr
    • Total cost (ongoing) 849 €/yr
    • First year −30 € 819 €/yr

    100% renewable; includes a Tallink Silja gift card

    View offer

Ranked by total cost in the first year at this consumption (8,108 kWh/yr), discounts included. Total costs shown are the ongoing price after the discount period. The electricity price is an assumed spot average, which you can adjust above. Spot electricity itself costs the same everywhere, contracts differ in margin and standing charge. Grid transfer charges and taxes are billed separately by the grid operator. Prices can change, so check the current price on the partner’s site.

Figures are estimates based on the prices and consumption given. Actual cost depends on charging habits, the electricity price and the car's actual consumption.

Estimated annual insurance cost (liability + comprehensive).

Driver's age 45 yrs
  • Liability insurance410 €/yr
  • Comprehensive7,550 €/yr
  • Total insurance7,960 €/yr

≈ 663 €/mo

Request a quote
Service provided by POP Vakuutus

The final price depends on factors such as claims history and place of residence, and is set in the quote.

Remember to check tyre condition with the seller.

BENTLEY CONTINENTAL (IV) AWD (2025) · GT 4.0 PHEV

Tyre sizes for this car

  • 315/30 R22 Original
  • 275/35 R22 Original

Wheel sizes for this car

22″

Original wheel size: 22″

What do the sizes mean?

Renkaatvaihtoon.fi guarantees that the tyres fit this exact car (JNK-222).

Order tyres See wheels too →

Frequently asked questions about this car

Which car has the registration JNK-222?

JNK-222 is a 2025 Bentley Continental with 4,000 km on the odometer. It is for sale at 375,000 €.

How much does Bentley Continental cost?

Bentley Continental is for sale at 375,000 €.

How long has this car been for sale?

The car has been for sale for at least 33 days. The listing entered bilbil.fi's tracking on 20/10/2026.

Has this car been on the market before?

No earlier completed sales are on record for this car.

What model year is the car?

The car is model year 2025 and was first registered on 15/01/2025.

How many kilometres has the car covered?

The car's mileage is 4,000 km.

When is the car due for its next inspection?

Based on the listing data, the first inspection is due by 15/01/2029. A car or van is inspected for the first time four years after it was first taken into use.

What fuel type and gearbox does the car have?

The fuel type is plug-in hybrid (petrol) and the gearbox is automatic.

How much is the car's vehicle tax?

Vehicle tax is 509 € per year. It consists of the base tax, determined by CO₂ emissions or gross weight, and the driving power tax, charged on fuels other than petrol.

What tyre size fits this car?

The car's original tyre size is 275/35 R22.

What is the car's battery capacity and range?

The battery capacity is 25.9 kWh and the stated range is about 85 km.

Where is Bentley Continental located?

The car is located in Uusimaa (Espoo, Uusimaa).

Is any battery warranty left?

156,000 km of battery warranty remains.

How much does the car cost to keep per year?

The estimate is 9,165 € per year: vehicle tax 509 €, insurance 7,960 €, electricity 696 €. Insurance and energy are estimates; vehicle tax is calculated from the car's own data.

Who is selling this car?

The seller is Bentley Suomi (Espoo).

Where can I see this car's price history?

This page shows the changes to the car's asking price, its sale periods and the edits made to the listing.